October 20 - October 24, 2014

Regional Map Henry Bates Vernon Barton Jasper Newton McDonald Barry Lawrence Dade Cedar Benton St. Clair Hickory Dallas Polk Greene Webster Christian Taney Stone

Click on a County:

 

 

This work schedule for the week is subject to change, especially because of bad weather.

 For the latest schedule, see "Today's Road Work"

 

Barry County

Maintenance:

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Barton County

Construction:
1st Street/I-49 Overpass in Lamar:
ROAD CLOSED: I-49 east outer road at First Street closed
ROAD CLOSED: NW 1 Lane (west outer road) north of the hospital closed
Lane closings at times on I-49
Completion: November 2014

Maintenance:

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Bates County

Maintanence:

Route B: One-lane traffic over Marais des Cygnes River east of Rich Hill. Bridge work.

Route V: One-lane traffic over Marais des Cygnes River and Walnut Creek near Foster. Bridge work.

Various routes: One-lane traffic, slow-moving train of work trucks and crews and equipment close to traffic. Filling potholes, repairing roadway edges, repairing and replacing signs and mowing.

 

Benton County

Construction:

Route 65: Lane closings in areas between Route MM and the Osage River south of Warsaw. Resurfacing and replacing guardrail.

Route 7: One-lane traffic in areas between Route 65 south of Warsaw and the Benton/Camden county line. Clean up work following resurfacing project.

Maintanence:

Route 7: One-lane traffic over Osage River in Warsaw. Bridge work.

Route 83: One-lane traffic over Pomme de Terre River south of Warsaw. Bridge work.

Route 82: One-lane traffic in areas west of Route 83 east of Harper. Pavement repairs.

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Cedar County

Maintenance:

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Christian County

Construction:

Route 14 Sidewalk Reconstruction Project in Nixa:
Nighttime lane closings possible at times. Work hours: 8 p.m. to 6 a.m.
Crews and equipment close to traffic
Completion: November 2014

Northbound Route 65 Bridge Replacement over Farmer's Branch Between Ozark and Springfield:
TRAFFIC SHIFT: Northbound lanes of Route 65 shifted to the median.

Nighttime lane closings possible at times. Work hours: 7:30 p.m. to 6 a.m.
Speed limit reduced to 55 mph
Completion: November 2014


Route CC/Cheyenne Road Intersection Widening and Curve Removal at Fremont Hills:

ROAD OPENING: Route CC scheduled to OPEN between Cheyenne Road and the entrance to Fremont Hills Friday, October 24.

Completion: November 2014

Maintenance:

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Dade County

Maintenance:

Various routes: One-lane traffic, slow-moving train of work trucks, crews and equipment close to traffic. Patching, cutting brush, repairing and replacing signs and mowing.

 

Dallas County

Construction:
Route 65: NIGHT WORK - Lane closings in areas at Skyline School near Urbana. Adding turn lanes. Work hours: 6 p.m. to 6 a.m. (Completion: September 2014)


Route 32: One-lane traffic in areas between Route H east of Buffalo and the Dallas/Laclede county line. Resurfacing.

Maintenance:

Route 65: One-lane traffic in areas between Buffalo and Urbana. Grinding pavement.

Route 64: One-lane traffic over Niangua River near the Dallas/Laclede county line. Bridge work.

 

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Greene County

Construction:

Battlefield Road/Route 65 Diverging Diamond Interchange in Springfield:

Crews and equipment close to traffic

Completion: September 2015

Glenstone Avenue Lane Additions Between Battlefield Road and James River Freeway in Springfield:

ROAD CLOSED: Republic Road east of Glenstone Avenue in Springfield closed until late October

Nighttime lane closings possible at times. Work hours: 7 p.m. to 6 a.m.
Completion: November 2014


Campbell Avenue Widening at Plainview Road in Springfield:

Nighttime lane closings at times. Work hours: 7 p.m. to 6 a.m.

Narrowed lanes

Expect delays at peak traffic times
Completion: November 2014


Greene County Routes MM/B Bridge Replacement over I-44 (Mile Marker 70) West of Springfield:

ROAD and RAMPS CLOSED: Routes MM/B and ramps closed at I-44 interchange until early November.

Nighttime lane closings on I-44 at times. Work hours: 7 p.m. to 6 a.m.
Completion: December 2014


Route 13: NIGHT WORK – One northbound and/or one southbound lane closed between the Greene/Polk county line and Norton Road in Springfield. Replacing guardrail, installing concrete islands at intersections, installing pavement markings and striping. Work hours: 7 p.m. to 6 a.m. Sunday-Friday.


Maintenance:

Chestnut Expressway (Business Loop 44): NIGHT WORK - Lane closings over the railroad tracks west of Sherman Avenue in Springfield. Bridge work. Work hours: 6:30 p.m. to 5 a.m. Sunday-Thursday.

Various routes: Slow-moving train of work trucks and crews and equipment close to traffic. Filling potholes, repairing and replacing signs and mowing.

 

Henry County

Construction:

Southbound Route 13/52 Bridge Replacement Over Truman Lake South of Clinton:
TRAFFIC SHIFT: Head-to-head traffic in northbound lanes of Route 13. One lane open in each direction with southbound traffic shifted to one northbound lane.
Lane closings over Truman Lake
Speed limit reduced to 55 mph
Completion: November 2014

Maintenance:

Route 2: One-lane traffic between NE 951 and NE 751 Roads west of Windsor. Installing a drain pipe.

Route 23: One-lane traffic between Route 2 and NE 1400 Road west of Windsor. Installing a drain pipe.

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.


Hickory County

Construction:

Route 65: NIGHT WORK - Lane closings in areas at Skyline School near Urbana. Adding turn lanes. Work hours: 6 p.m. to 6 a.m. (Completion: September 2014)

Maintenance:

Route 82: One-lane traffic west of Route 83 east of Harper. Pavement repairs.

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Jasper County

Construction:

I-44: NIGHT WORK - One eastbound and/or one westbound lane closed between Range Line Road in Joplin and Missouri/Oklahoma state line. Mile Markers 8-0. Resurfacing and installing guardrail. Work hours: 7 p.m. to 7 a.m. Monday-Saturday

Maintenance:

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Lawrence County

Maintenance:

Various routes: One-lane traffic, slow-moving train of work trucks and crews and equipment close to traffic. Patching, cutting brush, repairing and replacing signs and mowing.

 

McDonald County

Maintenance:

I-49: Slow-moving train of work trucks in areas between Pineville and the Missouri/Arkansas state line. Mile Markers 0-7. Sweeping roadway.

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Newton County

Construction:
I-44: NIGHT WORK
- One eastbound and/or one westbound lane closed between Range Line Road in Joplin and Missouri/Oklahoma state line. Mile Markers 8-0. Resurfacing and installing guardrail. Work hours: 7 p.m. to 7 a.m. Monday-Saturday

Maintenance:

Route C: Crews and equipment close to traffic near Loma Linda. Shoulder work.

Various routes: One-lane traffic, slow-moving train of work trucks and crews and equipment close to traffic. Cleaning bridges, repairing and replacing signs and mowing.

 

Polk County

Construction:
Route 13: Lane closings in areas between Route 54 in Collins and the Greene/Polk county line south of Bolivar. Resurfacing, installing rumble stripes and replacing guardrail.

Maintenance:

Various routes: Crews and equipment close to traffic. Repairing and replacing signs, and mowing.

 

St. Clair County

Construction:
Route 13: One northbound lane closed in areas between Route 54 in Collins and the Greene/Polk county line south of Bolivar. Resurfacing, installing rumble stripes and replacing guardrail.

Maintenance:

Route E: ROAD CLOSED between NW 400 and NW 225 Roads north of Roscoe. Installing a drain pipe. Work hours: 8 a.m. to 3:30 p.m. Monday, October 20.

Route C: ROAD CLOSED between NE 700 Road east of Lowry City and Route ZZ near Iconium. Installing a drain pipe. Work hours: 8 a.m. to 3:30 p.m. Wednesday, October 22.

Route W: One-lane traffic in areas west of Route J west of Collins. Shoulder work.

Various routes: Slow-moving train of work trucks and crews and equipment close to traffic. Sweeping roadways, repairing and replacing signs and mowing.

 

Stone County

Construction:
Route 76 Relocation between Route 465 and Route 265 west of Branson:

Nighttime lane closings at times. Work hours: 7 p.m. to 6 a.m.

Traffic shifted AWAY from where crews are working.

Completion: Fall 2014

Maintenance:

Route 413/265/248: One-lane traffic over Railey Creek near Galena. Bridge work.

Various routes: Crews and equipment close to traffic. Repairing and replacing signs and mowing.

 

Taney County

Maintenance:
Various routes:
One-lane traffic and crews and equipment close to traffic. Cleaning bridges, repairing and replacing signs and mowing.

 

Vernon County

Construction:

I-49 Outer Road: One-lane traffic north of Route E near Milo. Resurfacing.

Maintenance:

Various routes: One-lane traffic, crews and equipment close to traffic. Filling potholes, repairing and replacing signs and mowing.

 

Webster County

Construction:

Route 60 Freeway Upgrade in Rogersville:

Crossover roads and left-turn lanes scheduled to OPEN mid-week on Route 60 at Chicory Road and Peck Hollow Road east of Rogersville

Shoulders closed at times on Route 60 at Routes B/VV for ramp construction

One-lane traffic on Redbud Street between Harveststore Road and Chicory Road

Daytime lane closings on Route 60 at Chicory Road and at Peck Hollow Road east of Rogersville. Work hours: 9 a.m. to 3 p.m.

Speed limit reduced to 50 mph

Completion: December 2016

Maintenance:

Route OO: One-lane traffic in areas between Route 38 in Marshfield and Route B near Northview. Sealing pavement.

Various routes: One-lane traffic and crews and equipment close to traffic. Repairing roadway edges, repairing and replacing signs and mowing.

For highway construction or maintenance information, call MoDOT at 1.888.275.6636 .

 

 
 
 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
Moving Forward
Project Freeway: U.S. 60 Rogersville
On the Move
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Google+ Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed