September 01, 2016 03:14 PM
Project Freeway: U.S. 60 Rogersville
Update for Week of September 5, 2016
  • No work planned over Labor Day holiday weekend
  • Grading work on ramps and connector roads along Route 60 between Farm Roads 247 and 253 

 

Work Scheduled:  

  • Grading rock and dirt to build off ramps and connector roads along Route 60 between the Farm Road 247 and Farm Road 253 interchanges
  • Widening Farm Road 253 between Route 60 and Center Street (Business 60)
  • Installing road signs, street lighting and guardrail at Route 60/Farm Road 253 interchange
  • Grading work along Center Street between Farm Roads 247 and 253

 Traffic Impacts:

  • One lane of Route 60 closed in either direction between Farm Roads 247 and 253 during lower traffic volume times
  • One-lane traffic and traffic shifted away from where crews are working on Farm Road 253 between Route 60 and Center Street (Business 60)
  • New three-way stop at Farm Road 247 and Route 60 eastbound off ramp (south end of new Farm Road 247/Route 60 interchange)
  • Business 60 at Route 60 CLOSED permanently. Traffic signal removed.
  • Greene County Farm Road 243 at Route 60 CLOSED permanently
  • Greene County Farm Road 253 south of Route 60 CLOSED along with the Route 60 median crossover
  • Crews and equipment entering and leaving work areas 

(Weather or construction delays could alter the work schedule.) 

Project Summary:

  • Build an interchange at Route 60 and Routes B/VV -- COMPLETED
  • Build an interchange at Route 60 and Farm Road 253
  • Build an interchange at Route 60 at Farm Road 247 -- COMPLETED
  • Build turn lanes on Route 60 at Chicory Road and at Peck Hollow Road -- COMPLETED
  • Widen Farm Road 253 between Route 60 and Center Street
  • Reconfigure intersection of Route VV and Redbud Street -- COMPLETED
  • Improve the intersection of Route VV and Johnstown Drive
  • Build outer roads in areas to connect Rogersville streets to new interchanges

Design-Build Contractor: Ozark Regional Road Constructors

Completion Date: December 2016

Total Project Cost: $35 million

Follow MoDOT's Southwest District:

  • Facebook: MoDOT.Southwest
  • Twitter: MoDOT_Southwest
  • Instagram: @MoDOT_Southwest
Links to related information:

 

 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Report a Road Concern
Media Inquiries
Your Local Area Engineer
Route 65: THE REBUILD
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Instagram Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed