| |

Local News Releases

Southwest District Office 417.895.7600

July 01, 2016 08:13 AM
Project Freeway: U.S. 60 Rogersville
Update for Week of July 4, 2016
  • TRAFFIC ALERT: Interchange at Webster County Routes B/VV at U.S. Route 60 CLOSED July 8-11 to lay top layer of asphalt and apply pavement stripes on dogbone roundabout and widened portion of Route VV south of Route 60
  • During closing, access remains OPEN to all businesses.  Drivers urged to seek alternate routes. 

 

Work Scheduled:  

  • Route B/VV at Route 60
    • Paving the widened portion on the west side of Route VV
    • Laying final layer of asphalt and applying permanent pavement striping July 8-11
  • Route 60 at Greene County Farm Road 253 Interchange
    • Paving ramps and portions of the roundabouts ready for pavement
  • Route 60 at Greene County Farm Road 247 Interchange
    • Paving ramps at the new interchange 

Traffic Impacts:

  • INTERCHANGE CLOSING: Routes B/VV at Route 60 CLOSED along with the on and off ramps at the interchange
    • Work hours: 8 p.m. Friday, July 8, until 6 a.m. Monday, July 11
    • Businesses will remain OPEN. Drivers can reach businesses by using the Route 60/Business 60 intersection, the Farm Road 253 intersection on the north side of Route 60 west of the interchange and the Chicory Road/Peck Hollow Road intersection with Route 60 east of the interchange.
    • When Routes B/VV at Route 60 reopens on Monday morning, July 11, the dogbone roundabout will be complete
  • Greene County Farm Road 253 south of Route 60 CLOSED along with the Route 60 median crossover
  • Crews and equipment entering and leaving work areas, especially along Route 60 at Greene County Farm Roads 247 and 253 

(Weather or construction delays could alter the work schedule.) 

Project Summary:

  • Build an interchange at Route 60 and Routes B/VV
  • Build an interchange at Route 60 and Farm Road 253
  • Build an overpass over Route 60 at Farm Road 247
  • Build turn lanes on Route 60 at Chicory Road and at Peck Hollow Road -- COMPLETED
  • Widen Farm Road 253 between Route 60 and Center Street
  • Reconfigure intersection of Route VV and Redbud Street
  • Improve the intersection of Route VV and Johnstown Drive
  • Build outer roads in areas to connect Rogersville streets to new interchanges

Design-Build Contractor: Ozark Regional Road Constructors

Completion Date: December 2016

Total Project Cost: $35 million

Follow MoDOT's Southwest District:

  • Facebook: MoDOT.Southwest
  • Twitter: MoDOT_Southwest
  • Instagram: @MoDOT_Southwest
Links to related information:

 

 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Report a Road Concern
Media Inquiries
Your Local Area Engineer
Route 65: THE REBUILD
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Instagram Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed