| |

Local News Releases

Southwest District Office 417.895.7600

May 20, 2016 08:32 AM
Project Freeway: U.S. 60 Rogersville
Update for Week of May 23, 2016
  • Traffic shifts and work along Webster County Route V south of U.S. Route 60 to build a center-turn lane
  • Grading work begins for new roundabouts at the Route 60/Greene County Farm Road 253 interchange 

 

Work Scheduled:  

  • Route B/VV at Route 60
    • Building a center-turn lane south of Route 60
    • Installing drainage structures in various locations
    • Building curb and gutter along Route V
    • Rebuilding business entrances along Route V
  • Route 60 at Greene County Farm Road 253 Interchange
    • Building roundabouts on either end of the new Farm Road 253 bridge
    • Grading rock and dirt for future ramp on southwest corner of interchange
  • Route 60 at Greene County Farm Road 247 Interchange
    • Allowing new concrete bridge deck to cure properly 

Traffic Impacts:  

  • Route V traffic shifted toward the west
  • Business entrances narrowed or closed, if two entrances exist, along Route V south of Route 60. Access remains open to ALL businesses.
  • Greene County Farm Road 253 south of Route 60 CLOSED along with the Route 60 median crossover
  • Crews and equipment entering and leaving work areas, especially along Route 60 at Greene County Farm Roads 247 and 253 

(Weather or construction delays could alter the work schedule.) 

Project Summary:

  • Build an interchange at Route 60 and Routes B/VV
  • Build an interchange at Route 60 and Farm Road 253
  • Build an overpass over Route 60 at Farm Road 247
  • Build turn lanes on Route 60 at Chicory Road and at Peck Hollow Road -- COMPLETED
  • Widen Farm Road 253 between Route 60 and Center Street
  • Reconfigure intersection of Route VV and Redbud Street
  • Improve the intersection of Route VV and Johnstown Drive
  • Build outer roads in areas to connect Rogersville streets to new interchanges

Design-Build Contractor: Ozark Regional Road Constructors

Completion Date: December 2016

Total Project Cost: $35 million

Follow MoDOT's Southwest District:

  • Facebook: MoDOT.Southwest
  • Twitter: MoDOT_Southwest
  • Instagram: @MoDOT_Southwest
Links to related information:

 

 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Report a Road Concern
Media Inquiries
Your Local Area Engineer
Route 65: THE REBUILD
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Instagram Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed