Work zones for

Saturday - Monday

August 16-18

WEATHER PERMITTING

 

Cass County
Route D: Pavement replacement will close Route D to all through traffic between the entrance to Loch Lloyd and 165th Street through Sept. 5. Loch Lloyd residents must come in through the Route 58/174th Street side of the project for the next month. Through traffic on Route D will remain closed from Route 58 to Route 150 until late September.


Clay County

I-29: Pavement repairs will restrict traffic on southbound I-29 between Parvin Road and Davidson Road from 7:30 p.m. Tuesday, Aug. 19, to 6 a.m. Wednesday, Aug. 20.


I-29: New pavement construction will restrict traffic on northbound I-29 between Route 210 and River Front Road from 8 a.m. to 4 p.m. Thursday, Aug. 7, through Dec. 31.


I-35: Pavement repairs will restrict traffic on northbound I-35 near Fishing River bridge from 7:30 p.m. Monday, Aug. 18, to 6 a.m. Tuesday, Aug. 19.


I-35: Pavement repairs will restrict traffic at times in various locations on southbound I-35 between the Holt exit (Clay County line) and Route 92 through Aug. 29. All lanes will re-open during weekends.


I-29/35: Wall construction will close the right lane of eastbound Armour Road at I-29/35 from 8:30 a.m. to 3:30 p.m. through Friday, Aug. 22.


I-29/35: Storm drainage installation will close the northbound I-29/35 ramp to Bedford Road from 7 a.m. Saturday, Aug. 16, to 5 a.m. Monday, Aug. 18.


I-35: Sign removal will close the right lane of southbound I-35 between Front Street and Independence Avenue at noon on Monday, August 18. At 11:30 a.m., for approximately 15 minutes, crews will close southbound I-35 just before Independence Avenue.


I-35: Grading will close the left lane of northbound I-35 just past Independence Avenue from 8:30 a.m. to 3:30 p.m. Monday, Aug. 18 through Friday, Aug. 22.


I-35: Bridge deck removal will close the right lane of northbound I-35 between Bedford and 16th Street from 8:30 a.m. to 3:30 p.m. on Monday, Aug. 18 through Wednesday, Aug. 20.


I-35: Median wall removal will close the left lane of southbound I-35 between Levee Road and Bedford from 8:30 a.m. to 3:30 p.m. Tuesday, August 19 through Friday, August 22.


I-35: Median wall removal will close the left lane of northbound I-35 between Levee Road and Bedford from 8:30 a.m. to 3:30 p.m. Tuesday, August 19 through Friday, August 22.


I-35: Installation of decking will close two right lanes of southbound I-35 and shift traffic to two left lanes near Armour Boulevard from 8:30 a.m. to 3:30 p.m. through Friday, August 15 and again on Wednesday, August 20-Thursday, August 21 for clean-up.


Route EE: Tree trimming will close a lane of Route EE between Route 210 and H through August 22.

Henry County
Route 7: Milling and paving will restrict traffic on northbound and southbound Route 7 between Route B and Route 13 from 7 a.m. to 8 p.m. daily through Aug. 29.


Route 13: Milling and resurfacing will restrict traffic on northbound and southbound Route 13 between Route Z and Ohio Street from 7 a.m. to 8 p.m. weekdays through Aug. 29.


Route M: Patching of the driving surface will restrict traffic on Route M between Route N and Route 13 from 8 a.m. to 5 p.m. on Monday, August 18.


Jackson County
I-35: Bridge maintenance will close the right lane of southbound I-35 between Summit Street and Southwest Blvd. from9 a.m. to 3 p.m. on Tuesday, August 19.


I-35: Lane reconfiguration will close the ramp from north Paseo to northbound I-35 through July 2010.


I-29: Bridge work will close the right lane of northbound I-29 at Front Street through July 2009.


I-70: Shoulder work will close the left lane of eastbound and westbound I-70 between Blue Ridge Cutoff and Route 291 from 7 p.m. Sunday, August 17 to 3 p.m. Monday, August 18.


I-70: New pavement construction will close the ramp from Noland Road to westbound I-70 through August 25.


I-70: Bridge expansion joint repairs will restrict traffic on westbound I-70 to one, 12-foot lane on the Lewis & Clark Viaduct over the West Bottoms, shifting traffic from the inside lane to the outside lane through the end of September.


I-70: Bridge repairs will restrict westbound I-70 to two lanes at Manchester bridge through Oct. 6. Also the ramps will be closed from Manchester Trafficway to westbound I-70, and from northbound and southbound I-435 to westbound I-70 through Oct. 6.


I-435: Post base construction will close the right lane of the ramp from westbound I-70 to northbound I-435 from 9 a.m. to 4 p.m. Monday, August 18 through Tuesday, August 19.


I-435: Post base construction will close the right lane of northbound I-435 at Eastwood Trafficway from 9 a.m. to 4 p.m. on Monday, August 18.


I-435: Bridge maintenance will close the right lane of southbound I-435 between 12th Street and Route 40 from 9 a.m. to 3 p.m. on Monday, August 18.


Route 71: Road repairs will close one lane of the West Outer Road of Route 71 between Route 150 and Blue Ridge Blvd. from 6 p.m. to 1 a.m. Monday, August 18.


Route 71: Road repairs will close one lane of the East Outer Road of Route 71 between Route 150 and Blue Ridge Blvd. from 6 p.m. to 1 a.m. Monday, August 18.


Route 71: Bridge construction now restricts northbound Route 71 between 155th and 143rd Street to two lanes through at least April 2009. Southbound Route 71 traffic will shift to the west side of the northbound bridge on Aug. 22 to allow demolition of the west (southbound) bridge and construction of a new bridge. Southbound Route 71 will also then be reduced to two lanes from 143rd Street southward. Upon completion of the new southbound bridge next spring, traffic will be rerouted to two lanes in each direction over that bridge, and a similar demolition and reconstruction will commence on the northbound bridge into late 2009.


Route 71: Shoulder work will restrict various lanes of traffic of northbound and southbound Route 71 between 155th Street and Blue Ridge Boulevard from 6 a.m. to 6 p.m., Saturday, Aug. 16.


Route 71: Shoulder work will restrict various lanes of traffic of southbound Route 71 between 155th Street and Blue Ridge Boulevard from 7 a.m. to 3 p.m., Monday, Aug. 18 through Tuesday, August 19.


Route 71: Shoulder work will restrict various lanes of traffic of northbound Route 71 between 155th Street and Blue Ridge Boulevard from 6 a.m. to 11 p.m., Monday, Aug. 18.


Route 150: Pavement repair will restrict traffic on eastbound and westbound Route 150 at Route 50 from Friday, August 15 through August 22.


Route F: Utility installation at night will close Route F between 4th Street and 8th Street from 10 p.m. to 6 a.m. nightly beginning Friday, August 15 through Monday morning, August 18.


Route F: Road construction will close one lane of north and southbound Route F between 12th and 5th Streets through September.


Route V: Urgent repair of erosion along the shoulder will close Noland Road (Route V) between O'Flaherty Road and Murkins Road from Wednesday, Aug. 13, until Friday, Sept. 5.


Lafayette County
Route 20: Bridge work will restrict traffic in both directions on Route 20 Monday, August 11 through September 26.


Route 24: Resurfacing will restrict traffic on Route 24 between Route 65 and Route 13 through November 1.


Route P: Resurfacing will restrict traffic on Route P between Route 24 and Route F on Monday, August 4 through November 1.


Platte County
I-29: Bridge construction will close the right lane of southbound I-29 at I-635 through Oct. 15.


I-29: Bridge rehabilitation and repairs will close the left lane of southbound and northbound I-29 at Todd Creek near the I-29/435 split, reducing traffic to a single right lane through Oct. 15.


I-29: Bridge work will close the left lane of northbound I-29 at I-635 and the ramp from Gateway to I-29 will also be closed through Oct. 14.


I-29: Bridge work will restrict traffic on northbound I-29 at I-435 through Oct. 14.


I-29: Bridge work will restrict traffic on southbound I-29 between I-435 and Mexico City Avenue through Oct. 14.


I-29: Bridge rehabilitation and repairs will close the left lane of northbound I-29 at 56th Street through Monday, August 4. Traffic will then be switched to the left lane, closing the right lane of northbound I-29 through Oct. 15.


I-29: Bridge rehabilitation will close the left lane and shift traffic to right lanes of southbound I-29 at 56th Street through Oct. 15.


I-29: Bridge rehabilitation and repairs will close the ramp from Route A to northbound I-29 through Oct. 15.


I-435: Pavement repairs and paving will close various lanes of north and southbound I-435 from N.W. Cookingham Drive to I-29 during daytimes through September 31.


I-435: Paving work will restrict traffic on eastbound and westbound I-435 between I-29 and the Cookingham Drive ramps through Oct. 1.


Route 45: Tree trimming will close

one lane of northbound Route 45 at I-435 from 8 a.m. to 3 p.m. through August 29.

 

Long-Term Closures


Cass County
Route 71:
Shoulder work on the right turn at Commercial Street on northbound Route 71 could restrict traffic through September.


Clay County
I-29/35:
Bridge construction will close the southbound I-29/35 ramp to westbound Armour Road and the ramp from westbound Armour Road to southbound I-29/35 for at least one year.


Route 69: Milling and resurfacing operations will restrict traffic on northbound Route 69 between Waukomis Drive and I-35 through Oct. 1, 2008.


Route 92: Construction of a roundabout intersection at Route 92 and Commercial Avenue in Smithville will close Route 92 in both directions from Route 169 to Route DD through Aug. 18.


Jackson County
I-29:
Bridgework will close the exit ramp from northbound I-29 to Independence Avenue on Monday, June 30 after 5 p.m. through the end of September.


I-70: Expansion joint work on the Lewis and Clark Viaduct will reduce eastbound I-70 over the West Bottoms to two lanes through mid-September.


I-70: Expansion joint work on the Lewis and Clark Viaduct will reduce westbound I-70 over the West Bottoms to one 12-foot-wide lane and close both the ramp from Beardsley Road to westbound I-70 and the ramp from northbound I-35 to westbound I-70 (from the west side of the downtown loop to the Lewis Clark Viaduct Bridge) through the end of September.


I-70: Bridge maintenance and redecking will close the ramp from Route 40 to eastbound I-70 and from westbound I-70 to Manchester Trafficway through mid-August.


I-70: Bridge maintenance and redecking will close the eastbound I-70 ramp to Route 40 beginning 8 p.m. Friday, June 6, for up to 80 days. Eastbound I-70 will be restricted to only two lanes between Emanuel Cleaver II Boulevard and I-435 through late September.


Noland Road bridge over I-70: The bridge opened April 13, more than a month ahead of schedule. Bridge reconstruction will restrict lanes of Noland Road at the bridge over I-70, and one ramp may be closed at times for up to two weeks until work concludes this summer.


I-470/Route 50: Bridge construction has narrowed lanes through the interchange, and will close lanes in either direction during non-peak hours.


Route 150: Bridge replacement has reduced Route 150 to one narrow lane in each direction over Big Creek and the Union Pacific Railroad in Greenwood.


Route 12: Utility work will close the right lane of westbound Route 12 at Winner Road through Sept. 9.


Platte County
I-29:
Bridge crews will close a lane of northbound I-29 from Route HH to Route 273 at Platte City through Aug. 28, when redecking work is expected to conclude.


Route 9: Construction of new lanes and shoulders will reduce northbound Route 9 to one lane between I-635 and Mattox Road in Riverside through August.


Route 9: Construction of a temporary crossover will close the left lane of southbound Route 9 between Van de Populier and I-635 in Riverside through August.


Ray County
Route EE:
A rock slide has closed both northbound and southbound Route EE at the bridge over the BNSF railroad until a replacement can be constructed.

 

 

Click here on Road Construction (or left navigational bar at the top of this page) for a county-by-county listing of long-term construction projects in the Kansas City Area District.Questions? Call 1-888 ASK MODOT (1-888-275-6636).

The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

   
   
Real-time Traffic Real-time Traffic CONTACT CONTACT SURVEY SURVEY CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP Kansas City Area Southwest District North Central District Central District Springfield Area Northeast District St. Louis Area South Central District Southeast District Northwest District